Los Angeles / Orange County
Electrical Panel Upgrades & Replacement
Planning a panel replacement, a building electrical project or new equipment? Send MaxLumire the property location and a description of the work. Panel inquiries in Los Angeles and Orange County begin with a review of the existing installation and the intended scope.

01
A panel project starts with the existing system
The right scope depends on more than the size of the enclosure. Existing equipment, the loads being added, available space and access all matter. Describe whether the request concerns a single home or a multi-meter building, and whether other renovation work is involved.
- Panel replacement and upgrade inquiries
- Home and multi-meter building electrical projects
- Review of panel-related needs for an EV charger or renovation
02
What the project photos show
The gallery separates existing equipment from replacement work in progress. Open equipment is shown as project documentation, not a finished installation or proof of inspection. Completion, testing and any required approvals must be established for the particular job.
03
Information for the initial review
Include your city, the reason for the project, equipment you plan to add and the preferred timing. Photos should only be taken from a safe, accessible position. Do not remove covers, open equipment or touch wiring to prepare an inquiry. Scope, pricing and scheduling depend on the review and any applicable permit or utility coordination.

Project questions
Before you request a quote.
Can you price a panel replacement from a photo alone?
Photos help start the conversation but do not establish the full scope. Existing equipment, access, project requirements and any permit or utility coordination need review before pricing is confirmed.
Should I remove the panel cover to take a photo?
No. Do not remove covers or touch wiring for an inquiry. Only share photos you can take safely from an accessible position.
Does adding an EV charger always require a new panel?
A panel replacement should not be assumed. The existing installation and proposed charging equipment need assessment before the electrical scope is determined.
